      Twelve week work flow

 

1. Groundworks begin

2. Set the basic form Reinforce with basal

3.Cast foundation beams insulating Airstone CLGP

4. Installing wall formwork with electrical wiring

5. Cast walls in high-performance Airstone CLGP 500

6. Install arch formwork with ducted ventilation and sprinklers

7. Delivery and installation of windows and glass sections

8. Plastering and painting exterior

9 .Pour bathroom floor, lay mosaic and intstall porcelain.

10. Lay floor heating, pour floors with terracotta or white limestone, paint the inside, all with pozzolana

11. Install kitchen and cast stone countertop

12. Connect electric to the net